A
- ABC: 作業製成本制度 (Activity-Based Costing)
- ABB: 實施作業制預算制度 (Activity-Based Budgeting)
- ABM: 作業製成本管理 (Activity-Base Management)
- APS: 先進規劃與排程系統 (Advanced Planning and Scheduling)
- ASP: 應用程式服務供貨商(Application Service Provider)
- ATP: 可承諾量 (Available To Promise)
- AVL: 認可的供貨商清單(Approved Vendor List)
B
- BOM: 物料清單 (Bill Of Material)
- BPR: 企業流程再造 (Business Process Reengineering)
- BSC: 平衡記分卡 (Balanced Scorecard)
- BTF: 計畫生產 (Build To Forecast)
- BTO: 訂單生產 (Build To Order)
C
- CPM: 要徑法 (Critical Path Method)
- CPM: 每一百萬個使用者會有幾次抱怨(Complaint per Million)
- CRM: 客戶關係管理 (Customer Relationship Management)
- CRP: 產能需求規劃 (Capacity Requirements Planning)
- CTO: 客制化生產 (Configuration To Order)
D
- DBR: 限制驅導式排程法 (Drum-Buffer-Rope)
- DMT: 成熟度驗證(Design Maturing Testing)
- DVT: 設計驗證(Design Verification Testing)
- DRP: 運銷資源計畫 (Distribution Resource Planning)
- DSS: 決策支持系統 (Decision Support System)
E
- EC: 設計變更/工程變更 (Engineer Change)
- EC: 電子商務 (Electronic Commerce)
- ECRN: 原件規格更改通知(Engineer Change Request Notice)
- EDI: 電子數據交換 (Electronic Data Interchange)
- EIS: 主管決策系統 (Executive Information System)
- EMC: 電磁相容(Electric Magnetic Capability)
- EOQ: 基本經濟訂購量 (Economic Order Quantity)
- ERP: 企業資源規劃 (Enterprise Resource Planning)
F
- FAE: 套用工程師(Field Application Engineer)
- FCST: 預估(Forecast)
- FMS: 彈性製造系統 (Flexible Manufacture System)
- FQC: 成品質量管理 (Finish or Final Quality Control)
I
- IPQC: 製程質量管理 (In-Process Quality Control)
- IQC: 進料質量管理 (Incoming Quality Control)
- ISO: 國際標準組織 (International Organization for Standardization)
- ISAR: 首批樣品認可(Initial Sample Approval Request)
J
- JIT: 實時管理 (Just In Time)
K
L
M
- MES: 製造執行系統 (Manufacturing Execution System)
- MO:制令(Manufacture Order)
- MPS: 主生產排程 (Master Production Schedule)
- MRO: 請修(購)單(Maintenance Repair Operation)
- MRP: 物料需求規劃 (Material Requirement Planning)
- MRPII: 製造資源計畫 (Manufacturing Resource Planning)
N
- NFCF: 更改預估量的通知(Notice for Changing Forecast)
O
- OEM: 委託代工 (Original Equipment Manufacture)
- ODM: 委託設計與製造 (Original Design & Manufacture)
- OLAP: 線上分析處理 (On-Line Analytical Processing)
- OLTP: 線上交易處理 (On-Line Transaction Processing)
- OPT: 最佳生產技術 (Optimized Production Technology)
- OQC: 出貨質量管理 (Out-going Quality Control)
P
- PDCA: PDCA管理循環 (Plan-Do-Check-Action)
- PDM: 產品數據管理系統 (Product Data Management)
- PERT: 計畫評核術 (Program Evaluation and Review Technique)
- PO:訂單(Purchase Order)
- POH: 預估在手量 (Product on Hand)
- PR:採購申請(Purchase Request)
Q
- QA:質量保證(Quality Assurance)
- QC:質量管理(Quality Control)
- QCC: 品管圈 (Quality Control Circle)
- QE:質量工程(Quality Engineering)
R
- RCCP: 粗略產能規劃 (Rough Cut Capacity Planning)
- RMA: 退貨驗收Returned Material Approval
- ROP: 再訂購點 (Re-Order Point)
S
- SCM: 供應鏈管理 (Supply Chain Management)
- SFC: 現場控制 (Shop Floor Control)
- SIS: 策略信息系統 (Strategic Information System)
- SO:訂單(Sales Order)
- SOR: 特殊訂單需求(Special Order Request)
- SPC: 統計製程管制 (Statistic Process Control)
- sqe:供應商質量工程師(Supplier Quality Engineer)
T
- TOC: 限制理論 (Theory of Constraints)
- TPM: 全面生產管理Total Production Management
- TQC: 全面質量控制 (Total Quality Control)
- TQM: 全面質量管理 (Total Quality Management)
W
- WIP: 在制品 (Work In Process)